Difference between revisions of "Weir (Thomson Weir / V notch sharp crested weir)"

From Experimental Hydrology Wiki
Jump to navigation Jump to search
(Construction of a v notch weir)
 
Line 10: Line 10:
  
 
1. Planning:
 
1. Planning:
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germanyneeded permissions of following people:
+
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:
1. Owner  
+
<li>Owner</li>
  
 
==Advantages:==
 
==Advantages:==

Revision as of 21:25, 7 August 2007

Parameter to be measured:

Discharge of open channels

Method:

Equipment:

Construction:

1. Planning: Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:

  • Owner
  • Advantages:

    Disadvantages:

    What to watch out for:

    Problems/Questions:

    Links

    Projects that used the above equipment:


    Other related web sites:


    References