Difference between revisions of "Weir (Thomson Weir / V notch sharp crested weir)"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
==Construction:== | ==Construction:== | ||
− | # Planning: | + | #Planning: |
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people: | Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people: | ||
##Owner | ##Owner | ||
− | + | ##Fishing rights | |
− | + | ##District office | |
− | + | ##Nature conversation agency | |
− | |||
− | |||
− | |||
==Advantages:== | ==Advantages:== |
Revision as of 21:43, 7 August 2007
Parameter to be measured:
Discharge of open channels
Method:
Equipment:
Construction:
- Planning:
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:
- Owner
- Fishing rights
- District office
- Nature conversation agency
Advantages:
Disadvantages:
What to watch out for:
Problems/Questions:
Links
Projects that used the above equipment:
Other related web sites: