Difference between revisions of "Weir (Thomson Weir / V notch sharp crested weir)"

From Experimental Hydrology Wiki
Jump to navigation Jump to search
Line 9: Line 9:
 
==Construction:==
 
==Construction:==
  
# Planning:
+
#Planning:  
 
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:
 
Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:
  
 
##Owner
 
##Owner
 
+
##Fishing rights
2. Fishing rights
+
##District office
 
+
##Nature conversation agency
3. District office
 
 
 
4. Nature conversation agency
 
  
 
==Advantages:==
 
==Advantages:==

Revision as of 21:43, 7 August 2007

Parameter to be measured:

Discharge of open channels

Method:

Equipment:

Construction:

  1. Planning:

Before you can build a weir, you need permissions from different institutions . In my case I (Bavaria, Germany) needed permissions of following people:

    1. Owner
    2. Fishing rights
    3. District office
    4. Nature conversation agency

Advantages:

Disadvantages:

What to watch out for:

Problems/Questions:

Links

Projects that used the above equipment:


Other related web sites:


References